Cedar Crest CBRF and RCAC | This nearly 2-year project consisted of multiple buildings in a campus expansion at Cedar Crest in Janesville, WI. 1901 Inc. was brought on as a design assistant early trade partner for both Electrical and Mechanical trades, working through the design obstacles and budget items to bring this project to life. The major components of the project consisted of a 24-unit wood frame RCAC addition to the existing building, and a 76-unit CBRF stand-alone facility. Both projects consisted of coordination on the low voltage systems including nurse call, access control, horizontal and backbone cabling, fire alarm, and integration into the existing low voltage infrastructure.